What we do
- Select the system from the load calculation, not from the catalogue
- Design the interfaces with the rest of the building systems
- Supervise installation and commission against the design
- Support the system after handover
Latest from FläktGroup
-
November 25, 2026
FläktGroup launches eCO FLAT for space-saving, energy-efficient ventilation
-
November 11, 2026
A New Chapter. A New Corporate Video
-
October 28, 2026
Q3 Sustainability Update: Progress Across FläktGroup
-
October 14, 2026
FläktGroup Produces First 2.5MW DX Coolant Distribution Unit
Headlines from the manufacturer’s website (in English). Content belongs to its owner.
Have a project in mind?
Send drawings, a scope or a first idea. An engineer reviews it and replies.