
Samsung Eco Heating™ air-to-water heat pump sets, 24 Aug – 31 Oct 2026
Samsung Eco Heating™ campaign for air-to-water heating systems: efficient heating and cooling, hot water up to 65 °C, heating operation dow…
August 24, 2026 — October 31, 2026
Engineering. Integration. Performance.
Integrated MEP, HVAC and smart building solutions for complex projects.
VRF/VRV · Chillers · Heat pumps
AHU · Heat recovery · Smoke extraction
BMS · KNX · Controls
Offers & promotions
Manufacturer promotions and project offers, updated by our team.
Selected projects
Each project is documented as an engineering case study: scope, systems, challenge, solution, result.
What we engineer
We select, engineer, integrate, commission and support building systems.
Heating, cooling and hydronic systems, selected for the load and the building.
VRF / VRV · Chillers · Heat pumps
Clean, balanced air for people, processes and products.
Supply & exhaust · Heat recovery · AHU
One coordinated scope for every building system.
HVAC · Plumbing · Fire protection
Controls that make systems work together and show what they do.
BMS · Building controls · KNX
From concept to technical design, with the numbers shown.
Concept design · Technical design · System selection
The system is finished when it performs as designed.
Commissioning · Testing & balancing · Troubleshooting
How we engineer
Fewer assumptions, fewer changes later.
A decision based on numbers, not on a brand.
Documents a contractor can price and build from.
One team responsible for how the systems work together.
Proof that the system performs as specified.
Stable operation and a known contact for every question.
Industries
Technology & partners
We do not start from a brand. We start from the load, the building and the operator, then choose the equipment that fits, from the manufacturers we work with.
Equipment is selected after loads, airflow and hydraulics are calculated.
HVAC, plumbing, fire protection, electrical interfaces and controls managed together.
Options are compared on performance, service access and lifecycle cost.
Commissioning records show measured values against the design.
News & insights

What the SmartThings Pro cloud platform offers for buildings with Samsung systems, what it requires, and when it makes sense.

On 8 September we completed SmartThings Pro 2 training at Samsung Climate Solutions' training center in Amsterdam. Here is what it means fo…
Send drawings, a scope or a first idea. An engineer reviews it and replies.