Cheton Grup — Showroom & Offices
Climate and ventilation for a four-level showroom and office building with a conference hall, delivered by our own team: supply, installation, refrigerant charging, testing, commissioning and handover of the VRF heating & cooling system and of the ventilation, smoke-extraction and lift-shaft pressurisation systems, including their automation.

Engineering challenges
Very different spaces under one roof: open-plan showroom areas next to offices, meeting rooms and a 112-seat conference hall, each with its own loads and occupancy. The open spaces also needed smoke extraction sized for 53 000 m³/h with 39 000 m³/h of make-up air, plus lift-shaft pressurisation — all working together with the fire-alarm system. Refrigerant lines and ductwork had to fit above suspended ceilings in a building still under construction.
Solution
One independent VRF system per level, with the outdoor modules on the roof, so each floor runs, is serviced and can be metered on its own. 4-way cassettes in the offices and 360° cassettes in the open spaces give even air distribution without draughts. Fresh air comes from two heat-recovery air handling units per level, delivered through flat-oval ductwork that saves ceiling height, with plenum boxes and balancing dampers on every diffuser. Smoke-extraction fans, make-up dampers and pressurisation fans are controlled by the ventilation automation, which stops the AHUs and opens the smoke path on a fire signal.
Result
In progress — contract signed in October 2026, equipment ordered. Handover includes airflow measurement and balancing reports, smoke-extraction and pressurisation test records, as-built schemes and training for the client’s staff. 10-year warranty on the VRF compressors.
Have a project in mind?
Send drawings, a scope or a first idea. An engineer reviews it and replies.